TSS 903 Tovey substation interconnection queue
2 active projects totaling 518 MW in the PJM queue.
2 PJM queue filings name TSS 903 Tovey as the point of interconnection, all in Christian County, IL.
Target commercial operation date as filed: Oct 2030 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (2 filings).
2active projects
518active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2154 | TSS 903 Tovey 345 kV | 345 | 500 | Battery | Active | Oct 2030 |
| C01-2155 | TSS 903 Tovey 345 kV | 345 | 18 | Battery | Active | Oct 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Christian County, IL
- Kincaid-Pana: 5 active, 360.9 MW of 9 filed
- Kincaid: none active of 4 filed