Substation Scout

Rolling Farms Wind Project

PJM queue ID AF1-090

Rolling Farms Wind Project (AF1-090) is listed in the PJM interconnection queue as a 35.2 MW wind project in Christian County, IL. The filing names Kincaid-Pana as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2029.

Queue IDAF1-090
Project nameRolling Farms Wind Project
Status (as published)Engineering and Procurement
SubstationKincaid-Pana
Point of interconnectionKincaid-Pana
CountyChristian
StateIL
VoltageNot reported
Capacity35.2 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2029-12-31
Source datasetserial

Same substation and county

Kincaid-Pana substation: 9 requests in the PJM queue, 5 active totaling 360.9 MW.

Queue IDProjectMWResourceStatus
AE2-261Black Diamond Solar179.4SolarEP
AD2-100Broomstick Solar Energy Center126SolarSuspended
AG1-460Black Diamond Solar12BatteryEP
AD2-131Broomstick Solar Energy Center8.3SolarSuspended
AI2-133Kincaid-Pana 345kV84.1SolarWithdrawn
AE1-242Kincaid-Pana63SolarWithdrawn
AF1-252Kincaid-Pana62.4BatteryWithdrawn
AF1-253Kincaid-Pana43.2BatteryWithdrawn

Christian, IL: 18 requests in the PJM queue, 8 active totaling 1,125.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity35.2
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first