Broomstick Solar Energy Center

PJM queue ID AD2-100

Broomstick Solar Energy Center (AD2-100) is listed in the PJM interconnection queue as a 126 MW solar project in Christian County, IL. The filing names Kincaid-Pana as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 7, 2028.

Queue IDAD2-100
Project nameBroomstick Solar Energy Center
Status (as published)Suspended
SubstationKincaid-Pana
Point of interconnectionKincaid-Pana 345 kV
CountyChristian
StateIL
Voltage345 kV
Capacity126 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-07
Source datasetserial

Same substation and county

Kincaid-Pana substation: 9 requests in the PJM queue, 5 active totaling 360.9 MW.

Queue IDProjectMWResourceStatus
AE2-261Black Diamond Solar179.4SolarEP
AF1-090Rolling Farms Wind Project35.2WindEngineering and Procurement
AG1-460Black Diamond Solar12BatteryEP
AD2-131Broomstick Solar Energy Center8.3SolarSuspended
AI2-133Kincaid-Pana 345kV84.1SolarWithdrawn
AE1-242Kincaid-Pana63SolarWithdrawn
AF1-252Kincaid-Pana62.4BatteryWithdrawn
AF1-253Kincaid-Pana43.2BatteryWithdrawn

Christian, IL: 18 requests in the PJM queue, 8 active totaling 1,125.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy210
MW capacity126
MFO210

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first