Black Diamond Solar
PJM queue ID AG1-460
Black Diamond Solar (AG1-460) is listed in the PJM interconnection queue as a 12 MW battery project in Christian County, IL. The filing names Kincaid-Pana as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 15, 2030.
| Queue ID | AG1-460 |
|---|---|
| Project name | Black Diamond Solar |
| Status (as published) | EP |
| Substation | Kincaid-Pana |
| Point of interconnection | Kincaid-Pana 345 kV |
| County | Christian |
| State | IL |
| Voltage | 345 kV |
| Capacity | 12 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-15 |
| Source dataset | cycle |
Same substation and county
Kincaid-Pana substation: 9 requests in the PJM queue, 5 active totaling 360.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-261 | Black Diamond Solar | 179.4 | Solar | EP |
| AD2-100 | Broomstick Solar Energy Center | 126 | Solar | Suspended |
| AF1-090 | Rolling Farms Wind Project | 35.2 | Wind | Engineering and Procurement |
| AD2-131 | Broomstick Solar Energy Center | 8.3 | Solar | Suspended |
| AI2-133 | Kincaid-Pana 345kV | 84.1 | Solar | Withdrawn |
| AE1-242 | Kincaid-Pana | 63 | Solar | Withdrawn |
| AF1-252 | Kincaid-Pana | 62.4 | Battery | Withdrawn |
| AF1-253 | Kincaid-Pana | 43.2 | Battery | Withdrawn |
Christian, IL: 18 requests in the PJM queue, 8 active totaling 1,125.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Black Diamond Solar Power, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 30.0 |
| MW capacity | 12.0 |
| MFO | 329.0 |
| Submitted date | 9/30/2020 |
| Withdrawn remarks | Customer Milestone Not Met |
| Last updated | 5/5/2026 |