Gemstone Solar
PJM queue ID AF2-083
Gemstone Solar (AF2-083) is listed in the PJM interconnection queue as a 100 MW solar project in Cass County, MI. The filing names Kenzie Creek-Stone Lake as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2028.
| Queue ID | AF2-083 |
|---|---|
| Project name | Gemstone Solar |
| Status (as published) | Under Construction |
| Substation | Kenzie Creek-Stone Lake |
| Point of interconnection | Kenzie Creek-Stone Lake 69 kV |
| County | Cass |
| State | MI |
| Voltage | 69 kV |
| Capacity | 100 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-31 |
| Source dataset | serial |
Same substation and county
Kenzie Creek-Stone Lake substation: 2 requests in the PJM queue, 1 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF2-389 | Prairie Refuge Solar | 30 | Solar | Withdrawn |
Cass, MI: 20 requests in the PJM queue, 7 active totaling 1,778.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 100 |
| MFO | 150 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.