Mora Solar

PJM queue ID AG1-156

Mora Solar (AG1-156) is listed in the PJM interconnection queue as a 39.5 MW solar project in Carbon County, PA. The filing names Jack Frost-Lake Harmony as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 31, 2028.

Queue IDAG1-156
Project nameMora Solar
Status (as published)Engineering and Procurement
SubstationJack Frost-Lake Harmony
Point of interconnectionJack Frost-Lake Harmony 69 kV
CountyCarbon
StatePA
Voltage69 kV
Capacity39.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-08-31
Source datasetserial

Same substation and county

Jack Frost-Lake Harmony substation: 2 requests in the PJM queue, 1 active totaling 39.5 MW.

Queue IDProjectMWResourceStatus
AG2-174Jack Frost-Lake Harmony 69 kV13.2SolarWithdrawn

Carbon, PA: 24 requests in the PJM queue, 6 active totaling 74.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy60
MW capacity39.5
MFO60

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.