Mora Solar (AG1-156) is listed in the PJM interconnection queue as a 39.5 MW solar project in Carbon County, PA. The filing names Jack Frost-Lake Harmony as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 31, 2028.
| Queue ID | AG1-156 |
|---|---|
| Project name | Mora Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Jack Frost-Lake Harmony |
| Point of interconnection | Jack Frost-Lake Harmony 69 kV |
| County | Carbon |
| State | PA |
| Voltage | 69 kV |
| Capacity | 39.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-08-31 |
| Source dataset | serial |
Same substation and county
Jack Frost-Lake Harmony substation: 2 requests in the PJM queue, 1 active totaling 39.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-174 | Jack Frost-Lake Harmony 69 kV | 13.2 | Solar | Withdrawn |
Carbon, PA: 24 requests in the PJM queue, 6 active totaling 74.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 60 |
| MW capacity | 39.5 |
| MFO | 60 |