Hudson substation interconnection queue
1 active project totaling 80 MW in the PJM queue, plus 10 with terminal status (shown grayed).
11 PJM queue filings name Hudson as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Dec 2005 to Dec 2028 (9 filings). 1 active filing targets a date after November 27, 2026.
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| A22 | Hudson 230 kV | 230 | 750 | Gas | Withdrawn | n/r |
| Y3-001 | Hudson 230kV | 230 | 660 | Gas | Withdrawn | May 2017 |
| F02 | Hudson | n/r | 650 | Gas | Withdrawn | n/r |
| W4-024 | Hudson 230kV | 230 | 550 | Gas | Withdrawn | Jun 2014 |
| Z1-033 | Hudson 230kV | 230 | 400 | Not reported | Withdrawn | Oct 2017 |
| T45 | Hudson 230kV | 230 | 205 | Gas | Withdrawn | Jun 2011 |
| X4-018 | Hudson 230kV | 230 | 110 | Gas | Withdrawn | May 2015 |
| AB2-091 | Hudson 230kV | 230 | 100 | Gas | Withdrawn | May 2020 |
| AF1-245 | Hudson Energy Storage Facility | 230 | 80 | Battery | Engineering and Procurement | Dec 2028 |
| W4-038 | Hudson Generating Station | 230 | 24 | Coal | Deactivated | Aug 2018 |
| J02 | Hudson 230kV | 230 | 15 | Gas | Withdrawn | Dec 2005 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Hudson (PSEG, 2 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.