Hudson substation interconnection queue

1 active project totaling 80 MW in the PJM queue, plus 10 with terminal status (shown grayed).

11 PJM queue filings name Hudson as the point of interconnection, all in NJ.

Target commercial operation dates as filed run from Dec 2005 to Dec 2028 (9 filings). 1 active filing targets a date after November 27, 2026.

1active projects
80active MW
11total filed
Queue IDProjectkVMWResourceStatusTarget COD
A22 Hudson 230 kV 230 750 Gas Withdrawn n/r
Y3-001 Hudson 230kV 230 660 Gas Withdrawn May 2017
F02 Hudson n/r 650 Gas Withdrawn n/r
W4-024 Hudson 230kV 230 550 Gas Withdrawn Jun 2014
Z1-033 Hudson 230kV 230 400 Not reported Withdrawn Oct 2017
T45 Hudson 230kV 230 205 Gas Withdrawn Jun 2011
X4-018 Hudson 230kV 230 110 Gas Withdrawn May 2015
AB2-091 Hudson 230kV 230 100 Gas Withdrawn May 2020
AF1-245 Hudson Energy Storage Facility 230 80 Battery Engineering and Procurement Dec 2028
W4-038 Hudson Generating Station 230 24 Coal Deactivated Aug 2018
J02 Hudson 230kV 230 15 Gas Withdrawn Dec 2005

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Hudson (PSEG, 2 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Hudson County, NJ

All 41 PJM queue filings in Hudson County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first