Hudson substation interconnection queue

1 active project totalling 80 MW in the PJM queue, plus 10 with terminal status (shown greyed).

1active projects
80active MW
11total filed
Queue IDProjectkVMWResourceStatus
A22 Hudson 230 kV 230 750 Gas Withdrawn
Y3-001 Hudson 230kV 230 660 Gas Withdrawn
F02 Hudson n/r 650 Gas Withdrawn
W4-024 Hudson 230kV 230 550 Gas Withdrawn
Z1-033 Hudson 230kV 230 400 Not reported Withdrawn
T45 Hudson 230kV 230 205 Gas Withdrawn
X4-018 Hudson 230kV 230 110 Gas Withdrawn
AB2-091 Hudson 230kV 230 100 Gas Withdrawn
AF1-245 Hudson Energy Storage Facility 230 80 Battery Engineering and Procurement
W4-038 Hudson Generating Station 230 24 Coal Deactivated
J02 Hudson 230kV 230 15 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.