Bayonne substation interconnection queue
1 active project totalling 0.5 MW in the PJM queue, plus 5 with terminal status (shown greyed).
1active projects
0.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-055 | Bayonne 345kV | 345 | 1,041.4 | Gas | Withdrawn |
| A50 | Bayonne | n/r | 60 | Gas | Withdrawn |
| P23 | Bayonne 138kV | 138 | 45.5 | Gas | Withdrawn |
| X4-016 | Bayonne Cogen | 138 | 10 | Gas | Deactivated |
| W3-039 | Bayonne 26kV | 26 | 2.6 | Wind | Withdrawn |
| W1-101 | Bayonne SP | 13 | 0.5 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.