Substation Scout

Hudson Energy Storage Facility

PJM queue ID AF1-245

Hudson Energy Storage Facility (AF1-245) is listed in the PJM interconnection queue as a 80 MW battery project in Hudson County, NJ. The filing names Hudson as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 1, 2028.

Queue IDAF1-245
Project nameHudson Energy Storage Facility
Status (as published)Engineering and Procurement
SubstationHudson
Point of interconnectionHudson 230 kV
CountyHudson
StateNJ
Voltage230 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-01
Source datasetserial

Same substation and county

Hudson substation: 11 requests in the PJM queue, 1 active totaling 80 MW.

Queue IDProjectMWResourceStatus
A22Hudson 230 kV750GasWithdrawn
Y3-001Hudson 230kV660GasWithdrawn
F02Hudson650GasWithdrawn
W4-024Hudson 230kV550GasWithdrawn
Z1-033Hudson 230kV400Not reportedWithdrawn
T45Hudson 230kV205GasWithdrawn
X4-018Hudson 230kV110GasWithdrawn
AB2-091Hudson 230kV100GasWithdrawn
W4-038Hudson Generating Station24CoalDeactivated
J02Hudson 230kV15GasWithdrawn

Hudson, NJ: 41 requests in the PJM queue, 12 active totaling 1,163.4 MW.

A substation with the same name is named in PJM transmission planning materials: Hudson (PSEG, 2 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity80
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.