Turnpike substation interconnection queue

1 active project totalling 1.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
V2-025 Kearny SP 13.8 1.9 Solar In Service
V3-038 Turnpike SP 13 0.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.