Hilltop Energy Center Facility

PJM queue ID AC2-142

Hilltop Energy Center Facility (AC2-142) is listed in the PJM interconnection queue as a 129.7 MW gas project in Greene County, PA. The filing names Hatfield as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 9, 2021.

Queue IDAC2-142
Project nameHilltop Energy Center Facility
Status (as published)In Service
SubstationHatfield
Point of interconnectionHatfield 500kV
CountyGreene
StatePA
Voltage500 kV
Capacity129.7 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2021-05-09
Source datasetserial

Same substation and county

Hatfield substation: 9 requests in the PJM queue, 5 active totaling 2,295.8 MW.

Queue IDProjectMWResourceStatus
C01-1960Hatfield 500 kV931.1GasActive
C01-1723Hatfield 500 kV700GasActive
AA2-173Hilltop Energy Center Facility515GasIn Service
AB1-112Hilltop Energy Center Facility20GasIn Service
AA1-070Hatfield Ferry, Units 1, 2, and 31,590CoalWithdrawn
AC2-025Hatfield 500kV1,140GasWithdrawn
AC1-097Renaissance Energy Center1,040GasWithdrawn
L10Hatfield 500 kV520CoalWithdrawn

Greene, PA: 29 requests in the PJM queue, 5 active totaling 2,295.8 MW.

A substation with the same name is named in PJM transmission planning materials: Hatfield Substation (APS, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy129.7
MW capacity129.7
MFO664.7

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first