Garver 345 kV
PJM queue ID C01-2186
Garver 345 kV (C01-2186) is listed in the PJM interconnection queue as a 24 MW gas project in Butler County, OH. The filing names Garver as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 31, 2030.
| Queue ID | C01-2186 |
|---|---|
| Project name | Garver 345 kV |
| Status (as published) | Active |
| Substation | Garver |
| Point of interconnection | Garver 345 kV |
| County | Butler |
| State | OH |
| Voltage | 345 kV |
| Capacity | 24 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2030-10-31 |
| Source dataset | cycle |
Same substation and county
Garver substation: 2 requests in the PJM queue, 2 active totaling 149 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1286 | Garver 345 kV | 125 | Battery | Active |
Butler, OH: 24 requests in the PJM queue, 11 active totaling 874.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Ohio Power Partners, LLC |
|---|---|
| Transmission owner | DEOK |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 4.0 |
| MW capacity | 24.0 |
| MFO | 517.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.