Garver 345 kV
PJM queue ID C01-1286
Garver 345 kV (C01-1286) is listed in the PJM interconnection queue as a 125 MW battery project in Butler County, OH. The filing names Garver as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 1, 2029.
| Queue ID | C01-1286 |
|---|---|
| Project name | Garver 345 kV |
| Status (as published) | Active |
| Substation | Garver |
| Point of interconnection | Garver 345 kV |
| County | Butler |
| State | OH |
| Voltage | 345 kV |
| Capacity | 125 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-04-01 |
| Source dataset | cycle |
Same substation and county
Garver substation: 2 requests in the PJM queue, 2 active totaling 149 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2186 | Garver 345 kV | 24 | Gas | Active |
Butler, OH: 24 requests in the PJM queue, 11 active totaling 874.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Mariner Shaker Creek, LLC |
|---|---|
| Transmission owner | DEOK |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 125.0 |
| MW capacity | 125.0 |
| MFO | 125.0 |
| Submitted date | 4/27/2026 |
| Last updated | 8/6/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.