Galion-Roberts South substation interconnection queue
1 active project totaling 62.1 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Galion-Roberts South as the point of interconnection, all in Marion County, OH.
Target commercial operation dates as filed run from Jun 2019 to Dec 2025 (2 filings).
1active projects
62.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-195 | Marion County Solar Project | 138 | 62.1 | Solar | Partially in Service - Under Construction | Dec 2025 |
| AB2-131 | Galion-Roberts South 138kV | 138 | 57 | Solar | Withdrawn | Jun 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Marion County, OH
- Galion-Roberts South II: none active of 2 filed
- La Rue: none active of 2 filed
- Roberts: none active of 2 filed
- South Morral-Uncapher Switch: none active of 2 filed
Site Scanner