Substation Scout

Marion County Solar Project

PJM queue ID AC2-195

Marion County Solar Project (AC2-195) is listed in the PJM interconnection queue as a 62.1 MW solar project in Marion County, OH. The filing names Galion-Roberts South as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 31, 2025.

Queue IDAC2-195
Project nameMarion County Solar Project
Status (as published)Partially in Service - Under Construction
SubstationGalion-Roberts South
Point of interconnectionGalion-Roberts South 138 kV
CountyMarion
StateOH
Voltage138 kV
Capacity62.1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Galion-Roberts South substation: 2 requests in the PJM queue, 1 active totaling 62.1 MW.

Queue IDProjectMWResourceStatus
AB2-131Galion-Roberts South 138kV57SolarWithdrawn

Marion, OH: 17 requests in the PJM queue, 2 active totaling 84.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy99.96
MW capacity62.1
MFO99.96

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first