Marion County Solar Project
PJM queue ID AC2-195
Marion County Solar Project (AC2-195) is listed in the PJM interconnection queue as a 62.1 MW solar project in Marion County, OH. The filing names Galion-Roberts South as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 31, 2025.
| Queue ID | AC2-195 |
|---|---|
| Project name | Marion County Solar Project |
| Status (as published) | Partially in Service - Under Construction |
| Substation | Galion-Roberts South |
| Point of interconnection | Galion-Roberts South 138 kV |
| County | Marion |
| State | OH |
| Voltage | 138 kV |
| Capacity | 62.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-12-31 |
| Source dataset | serial |
Same substation and county
Galion-Roberts South substation: 2 requests in the PJM queue, 1 active totaling 62.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB2-131 | Galion-Roberts South 138kV | 57 | Solar | Withdrawn |
Marion, OH: 17 requests in the PJM queue, 2 active totaling 84.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 99.96 |
| MW capacity | 62.1 |
| MFO | 99.96 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.