South Morral-Uncapher Switch substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name South Morral-Uncapher Switch as the point of interconnection, all in Marion County, OH.
Target commercial operation date as filed: Dec 2024 (2 filings).
Transmission owner as filed: AEP (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-572 | South Morral-Uncapher Switch 69 kV | 69 | 19.3 | Solar | Withdrawn | Dec 2024 |
| AH1-573 | South Morral-Uncapher Switch 69 kV | 69 | 12.9 | Solar | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Marion County, OH
- Galion-Roberts South: 1 active, 62.1 MW of 2 filed
- Galion-Roberts South II: none active of 2 filed
- La Rue: none active of 2 filed
- Roberts: none active of 2 filed
Site Scanner