South Morral-Uncapher Switch substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-572 | South Morral-Uncapher Switch 69 kV | 69 | 19.3 | Solar | Withdrawn |
| AH1-573 | South Morral-Uncapher Switch 69 kV | 69 | 12.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.