Substation Scout

South Morral-Uncapher Switch substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-572 South Morral-Uncapher Switch 69 kV 69 19.3 Solar Withdrawn
AH1-573 South Morral-Uncapher Switch 69 kV 69 12.9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.