Substation Scout

Marion, OH interconnection queue

3 active projects totalling 137.7 MW in the PJM queue, plus 14 with terminal status (shown greyed).

3active projects
137.7active MW
17total filed
Queue IDProjectkVMWResourceStatus
AC2-195 Marion County Solar Project 138 62.1 Solar Partially in Service - Under Construction
AB2-131 Galion-Roberts South 138kV 138 57 Solar Withdrawn
AG2-119 Galion-Roberts South 138 kV II 138 53.6 Solar Active
AG2-218 La Rue 69 kV 69 32 Solar Withdrawn
X3-030 Shelby-S.W. Lima 345kV 345 31.9 Wind Withdrawn
AH2-344 La Rue 138 kV 138 30.2 Hybrid Withdrawn
AH1-075 North Waldo - Wild Creek 138 kV 138 24.7 Solar Withdrawn
AD1-106 Chestnut Solar 138 22.8 Solar Withdrawn
AI2-341 Galion-Roberts South 138 kV III 138 22.8 Solar Withdrawn
AH1-542 Green Camp Solar II 138 22 Hybrid Active
AE2-324 Galion-Roberts South II 138 kV 138 20.3 Battery Withdrawn
AH1-572 South Morral-Uncapher Switch 69 kV 69 19.3 Solar Withdrawn
AI1-175 Waldo - North Waldo 69 kV 69 16.2 Hybrid Withdrawn
AH1-573 South Morral-Uncapher Switch 69 kV 69 12.9 Solar Withdrawn
W4-043 Roberts 34.5kV 34.5 7.6 Solar Withdrawn
X3-059 Roberts 34.5kV 34.5 7.6 Solar Withdrawn
AG2-595 LaRue - North Waldo 138 kV 138 6.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.