Galion-Roberts South II substation interconnection queue

1 active project totalling 53.6 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
53.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-119 Galion-Roberts South 138 kV II 138 53.6 Solar Active
AE2-324 Galion-Roberts South II 138 kV 138 20.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.