Galion-Roberts South II substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Galion-Roberts South II as the point of interconnection, all in Marion County, OH.
Target commercial operation dates as filed run from Dec 2022 to Sep 2029 (2 filings).
Transmission owner as filed: ATSI (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-119 | Galion-Roberts South 138 kV II | 138 | 53.6 | Solar | Withdrawn | Sep 2029 |
| AE2-324 | Galion-Roberts South II 138 kV | 138 | 20.3 | Battery | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-119 | Terminal status | 53.6 | Active → Withdrawn |
Other PJM queue substations in Marion County, OH
- Galion-Roberts South: 1 active, 62.1 MW of 2 filed
- La Rue: none active of 2 filed
- Roberts: none active of 2 filed
- South Morral-Uncapher Switch: none active of 2 filed