Galion-Roberts South II substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Galion-Roberts South II as the point of interconnection, all in Marion County, OH.

Target commercial operation dates as filed run from Dec 2022 to Sep 2029 (2 filings).

Transmission owner as filed: ATSI (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-119 Galion-Roberts South 138 kV II 138 53.6 Solar Withdrawn Sep 2029
AE2-324 Galion-Roberts South II 138 kV 138 20.3 Battery Withdrawn Dec 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-119Terminal status53.6 Active → Withdrawn

Other PJM queue substations in Marion County, OH

All 17 PJM queue filings in Marion County, OH.