Desoto - Keystone 345 kV
PJM queue ID C01-1710
Desoto - Keystone 345 kV (C01-1710) is listed in the PJM interconnection queue as a 75 MW hybrid project in Blackford County, IN. The filing names Desoto - Keystone as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2030.
| Queue ID | C01-1710 |
|---|---|
| Project name | Desoto - Keystone 345 kV |
| Status (as published) | Active |
| Substation | Desoto - Keystone |
| Point of interconnection | Desoto - Keystone 345 kV |
| County | Blackford |
| State | IN |
| Voltage | 345 kV |
| Capacity | 75 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2030-12-01 |
| Source dataset | cycle |
Same substation and county
Desoto - Keystone substation: 3 requests in the PJM queue, 2 active totaling 141.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1712 | Desoto - Keystone 345 kV | 66.4 | Wind | Active |
| AI2-064 | Desoto - Keystone 345 kV | 35.8 | Solar | Withdrawn |
Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | RWE Solar Development, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 150.0 |
| MW capacity | 75.0 |
| MFO | 150.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.