Tippecance, IN interconnection queue

1 active project totalling 88.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
88.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-555 Rainbow Trout 345 88.4 Hybrid Engineering and Procurement
Y2-084 Dequine 345kV 345 3.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.