DeQuine substation interconnection queue
3 active projects totaling 159.8 MW in the PJM queue.
3 PJM queue filings name DeQuine as the point of interconnection, all in Tippecanoe County, IN.
Target commercial operation date as filed: Jun 2026 (3 filings).
Transmission owner as filed: AEP (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1277 | DeQuine 345 kV | 345 | 78.7 | Wind | Active | Jun 2026 |
| C01-1278 | DeQuine 345 kV | 345 | 54 | Wind | Active | Jun 2026 |
| C01-1279 | DeQuine 345 kV | 345 | 27.1 | Wind | Active | Jun 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “DeQuine” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Dequine: PJM interconnection queue (IN)
Other PJM queue substations in Tippecanoe County, IN
No other substation in Tippecanoe County, IN is named as a point of interconnection in the PJM queue.