Rainbow Trout
PJM queue ID AG1-555
Rainbow Trout (AG1-555) is listed in the PJM interconnection queue as a 88.4 MW hybrid project in Tippecance County, IN. The filing names Dequine as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 31, 2029.
| Queue ID | AG1-555 |
|---|---|
| Project name | Rainbow Trout |
| Status (as published) | Engineering and Procurement |
| Substation | Dequine |
| Point of interconnection | Dequine 345 kV |
| County | Tippecance |
| State | IN |
| Voltage | 345 kV |
| Capacity | 88.4 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-01-31 |
| Source dataset | serial |
Same substation and county
Dequine substation: 7 requests in the PJM queue, 1 active totaling 88.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG2-344 | Dequine 345 bkV | 78 | Battery | Withdrawn |
| AD1-137 | Dequine 345 kV | 65 | Wind | Withdrawn |
| AD2-015 | Dequine 345 kV | 65 | Wind | Withdrawn |
| U1-087 | Dequine 345kV | 19.5 | Wind | Withdrawn |
| U1-088 | Dequine 345kV | 13 | Wind | Withdrawn |
| Y2-084 | Dequine 345kV | 3.3 | Battery | Withdrawn |
Tippecance, IN: 2 requests in the PJM queue, 1 active totaling 88.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 120 |
| MW capacity | 88.4 |
| MFO | 120 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.