Substation Scout

Rainbow Trout

PJM queue ID AG1-555

Rainbow Trout (AG1-555) is listed in the PJM interconnection queue as a 88.4 MW hybrid project in Tippecance County, IN. The filing names Dequine as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 31, 2029.

Queue IDAG1-555
Project nameRainbow Trout
Status (as published)Engineering and Procurement
SubstationDequine
Point of interconnectionDequine 345 kV
CountyTippecance
StateIN
Voltage345 kV
Capacity88.4 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2029-01-31
Source datasetserial

Same substation and county

Dequine substation: 7 requests in the PJM queue, 1 active totaling 88.4 MW.

Queue IDProjectMWResourceStatus
AG2-344Dequine 345 bkV78BatteryWithdrawn
AD1-137Dequine 345 kV65WindWithdrawn
AD2-015Dequine 345 kV65WindWithdrawn
U1-087Dequine 345kV19.5WindWithdrawn
U1-088Dequine 345kV13WindWithdrawn
Y2-084Dequine 345kV3.3BatteryWithdrawn

Tippecance, IN: 2 requests in the PJM queue, 1 active totaling 88.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity88.4
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first