Meadow Forge Solar Energy Center

PJM queue ID AE2-169

Meadow Forge Solar Energy Center (AE2-169) is listed in the PJM interconnection queue as a 33 MW solar project in Delaware County, IN. The filing names Delaware-Van Buren as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of November 30, 2026.

Queue IDAE2-169
Project nameMeadow Forge Solar Energy Center
Status (as published)Suspended
SubstationDelaware-Van Buren
Point of interconnectionDelaware-Van Buren 138 kV
CountyDelaware
StateIN
Voltage138 kV
Capacity33 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-30
Source datasetserial

Same substation and county

Delaware-Van Buren substation: 4 requests in the PJM queue, 3 active totaling 97.8 MW.

Queue IDProjectMWResourceStatus
AE1-208Meadow Forge Solar Energy Center55SolarSuspended
AH1-304Delaware-Van Buren 138 kV9.8SolarActive
AH1-307Delaware-Van Buren 138 kV50BatteryWithdrawn

Delaware, IN: 22 requests in the PJM queue, 5 active totaling 264.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy33
MW capacity33
MFO163

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.