Delaware-Van Buren 138 kV
PJM queue ID AH1-304
Delaware-Van Buren 138 kV (AH1-304) is listed in the PJM interconnection queue as a 9.8 MW solar project in Delaware County, IN. The filing names Delaware-Van Buren as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | AH1-304 |
|---|---|
| Project name | Delaware-Van Buren 138 kV |
| Status (as published) | Active |
| Substation | Delaware-Van Buren |
| Point of interconnection | Delaware-Van Buren 138 kV |
| County | Delaware |
| State | IN |
| Voltage | 138 kV |
| Capacity | 9.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Delaware-Van Buren substation: 4 requests in the PJM queue, 3 active totaling 97.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE1-208 | Meadow Forge Solar Energy Center | 55 | Solar | Suspended |
| AE2-169 | Meadow Forge Solar Energy Center | 33 | Solar | Suspended |
| AH1-307 | Delaware-Van Buren 138 kV | 50 | Battery | Withdrawn |
Delaware, IN: 22 requests in the PJM queue, 5 active totaling 264.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Meadow Forge Solar Energy LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 0.0 |
| MW capacity | 9.8 |
| MFO | 163.0 |
| Submitted date | 9/11/2021 |
| Last updated | 9/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.