Alamance, NC interconnection queue
2 active projects totalling 50.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
50.2active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-133 | Elizabeth City-Tanglewood 230 kV | 230 | 201 | Solar | Withdrawn |
| AC1-098 | American Beech Solar | 115 | 37.6 | Solar | In Service |
| AC1-099 | American Beech Solar | 115 | 12.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.