Alamance, NC interconnection queue

2 active projects totalling 50.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
50.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-133 Elizabeth City-Tanglewood 230 kV 230 201 Solar Withdrawn
AC1-098 American Beech Solar 115 37.6 Solar In Service
AC1-099 American Beech Solar 115 12.6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.