Substation Scout

Alamance, NC interconnection queue

2 active projects totaling 50.2 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2active projects
50.2active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-133 Elizabeth City-Tanglewood 230 kV 230 201 Solar Withdrawn
AC1-098 American Beech Solar 115 37.6 Solar In Service
AC1-099 American Beech Solar 115 12.6 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.