Culpeper substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).

8 PJM queue filings name Culpeper as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Oct 2017 to Oct 2022 (8 filings).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC2-113 Culpeper North 35 13.3 Solar Withdrawn Dec 2021
AB2-052 Culpeper 34.5kV 34.5 13 Solar Withdrawn Oct 2017
AG1-344 Culpeper 34.5 kV 34.5 12 Solar Withdrawn Jun 2022
AB2-023 Culpeper 34.5kV 34.5 9.7 Solar Withdrawn Oct 2017
AB1-152 Stevensburg Solar 34.5 7.6 Solar Withdrawn Oct 2019
AD1-049 Culpeper 34.5 kV 34.5 6.3 Solar Withdrawn Dec 2019
AF2-401 Stevensburg Road Solar 34.5 3.5 Solar Withdrawn Oct 2022
AB2-053 Culpeper 34.5kV 34.5 0 Solar Withdrawn Oct 2017

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Culpeper” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Culpeper County, VA

All 27 PJM queue filings in Culpeper County, VA.