Culpeper substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 8 with terminal status (shown greyed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
AC2-113 Culpeper North 35 13.3 Solar Withdrawn
AB2-052 Culpeper 34.5kV 34.5 13 Solar Withdrawn
AG1-344 Culpeper 34.5 kV 34.5 12 Solar Withdrawn
AB2-023 Culpeper 34.5kV 34.5 9.7 Solar Withdrawn
AB1-152 Stevensburg Solar 34.5 7.6 Solar Withdrawn
AD1-049 Culpeper 34.5 kV 34.5 6.3 Solar Withdrawn
AF2-401 Stevensburg Road Solar 34.5 3.5 Solar Withdrawn
AB2-053 Culpeper 34.5kV 34.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.