Culpeper substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 8 with terminal status (shown grayed).
8 PJM queue filings name Culpeper as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Oct 2017 to Oct 2022 (8 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-113 | Culpeper North | 35 | 13.3 | Solar | Withdrawn | Dec 2021 |
| AB2-052 | Culpeper 34.5kV | 34.5 | 13 | Solar | Withdrawn | Oct 2017 |
| AG1-344 | Culpeper 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Jun 2022 |
| AB2-023 | Culpeper 34.5kV | 34.5 | 9.7 | Solar | Withdrawn | Oct 2017 |
| AB1-152 | Stevensburg Solar | 34.5 | 7.6 | Solar | Withdrawn | Oct 2019 |
| AD1-049 | Culpeper 34.5 kV | 34.5 | 6.3 | Solar | Withdrawn | Dec 2019 |
| AF2-401 | Stevensburg Road Solar | 34.5 | 3.5 | Solar | Withdrawn | Oct 2022 |
| AB2-053 | Culpeper 34.5kV | 34.5 | 0 | Solar | Withdrawn | Oct 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Culpeper” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Culpeper: Expansion Tracker, PJM planning: DOM state not printed
Other PJM queue substations in Culpeper County, VA
- Brandy - McDevitt: 2 active, 415 MW of 2 filed
- Gordonsville-Remington: none active of 2 filed
- Mitchell-Mountain Run: none active of 2 filed
- Mountain Run-Mitchell: none active of 2 filed
- Remington- Gordonsville: none active of 2 filed
- Remington-Gordonsville: none active of 2 filed