Culpeper, VA interconnection queue
8 active projects totalling 1,057.6 MW in the PJM queue, plus 19 with terminal status (shown greyed).
8active projects
1,057.6active MW
27total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1906 | Brandy - McDevitt 230 kV | 230 | 300 | Battery | Active |
| C01-1905 | Germanna - Gordonsville 230 kV | 230 | 200 | Battery | Active |
| C01-1907 | Kyser - Remington 230 kV | 230 | 200 | Battery | Active |
| C01-1779 | Brandy - McDevitt 230 kV | 230 | 115 | Battery | Active |
| C01-2013 | Germanna 230 kV | 230 | 100 | Battery | Active |
| AH1-437 | Remington- Gordonsville 230kV | 230 | 90 | Solar | Withdrawn |
| AE1-153 | Maroon Solar | 230 | 89.4 | Solar | Engineering and Procurement |
| AC2-022 | Gordonsville-Remington 230kV | 230 | 70.6 | Solar | Withdrawn |
| AH1-438 | Remington- Gordonsville 230kV | 230 | 60 | Battery | Withdrawn |
| AC2-121 | Gordonsville-Remington 230kV | 230 | 57 | Solar | Withdrawn |
| AC1-143 | Elkwood Solar | 115 | 41.2 | Solar | Withdrawn |
| AE2-188 | Mitchell DP-Mountain Run 115 kV | 115 | 40 | Battery | Withdrawn |
| AC1-120 | Cricket Solar | 115 | 39.6 | Solar | Engineering and Procurement |
| AC1-043 | Greenwood Solar | 115 | 38 | Solar | Withdrawn |
| AG1-538 | Remington-Gordonsville 230 kV | 230 | 32 | Battery | Withdrawn |
| AC2-102 | Mitchell DP 115kV | 115 | 30.4 | Solar | Withdrawn |
| AD1-115 | Greenwood Solar | 115 | 19 | Solar | Withdrawn |
| AC1-121 | Cricket Solar | 115 | 13.6 | Solar | Engineering and Procurement |
| AC2-113 | Culpeper North | 35 | 13.3 | Solar | Withdrawn |
| AB2-052 | Culpeper 34.5kV | 34.5 | 13 | Solar | Withdrawn |
| AE1-180 | Mountain Run 115 kV | 115 | 12 | Solar | Withdrawn |
| AG1-344 | Culpeper 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AB2-023 | Culpeper 34.5kV | 34.5 | 9.7 | Solar | Withdrawn |
| AD1-049 | Culpeper 34.5 kV | 34.5 | 6.3 | Solar | Withdrawn |
| AF2-401 | Stevensburg Road Solar | 34.5 | 3.5 | Solar | Withdrawn |
| AE1-057 | Brandy DP 115 kV | 115 | 3.3 | Solar | Withdrawn |
| AB2-053 | Culpeper 34.5kV | 34.5 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.