Gordonsville-Remington substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC2-022 Gordonsville-Remington 230kV 230 70.6 Solar Withdrawn
AC2-121 Gordonsville-Remington 230kV 230 57 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.