Remington-Gordonsville substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Remington-Gordonsville as the point of interconnection, all in Culpeper County, VA.

Target commercial operation dates as filed run from Oct 2024 to May 2027 (2 filings).

Transmission owner as filed: Dominion (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-153 Maroon Solar 230 89.4 Solar Withdrawn May 2027
AG1-538 Remington-Gordonsville 230 kV 230 32 Battery Withdrawn Oct 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-11-02AE1-153Status changen/a Pending Termination → Withdrawn
2026-09-23AE1-153Terminal status89.4 Engineering and Procurement → Pending Termination

Same name on other Substation Scout pages

Other sources that print a substation named “Remington-Gordonsville” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Culpeper County, VA

All 27 PJM queue filings in Culpeper County, VA.