Remington-Gordonsville substation interconnection queue
1 active project totalling 89.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
89.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-153 | Maroon Solar | 230 | 89.4 | Solar | Engineering and Procurement |
| AG1-538 | Remington-Gordonsville 230 kV | 230 | 32 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.