Halifax County Solar (AC1-208) is listed in the PJM interconnection queue as a 55.4 MW solar project in Halifax County, NC. The filing names Cox-Whitakers as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of August 9, 2026.

Queue IDAC1-208
Project nameHalifax County Solar
Status (as published)Partially in Service - Under Construction
SubstationCox-Whitakers
Point of interconnectionCox-Whitakers 115kV
CountyHalifax
StateNC
Voltage115 kV
Capacity55.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-08-09
Source datasetserial

Same substation and county

Cox-Whitakers substation: 3 requests in the PJM queue, 1 active totaling 55.4 MW.

Queue IDProjectMWResourceStatus
AI2-295Cox-Whitakers 115kV20.6SolarWithdrawn
AG1-159Cox-Whitakers 115 kV0BatteryWithdrawn

Halifax, NC: 22 requests in the PJM queue, 8 active totaling 355.8 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-26 Status change n/a Under Construction → Partially in Service - Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity55.4
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first