Cook substation interconnection queue
1 active project totaling 84 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Cook as the point of interconnection, all in Berrien County, MI.
Target commercial operation dates as filed run from Jan 2007 to Jun 2009 (2 filings).
1active projects
84active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| N46 | Cook 345kV | 345 | 1,120 | Gas | Withdrawn | Jun 2009 |
| O42 | Cook #1 | 345 | 84 | Nuclear | In Service | Jan 2007 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Berrien County, MI
- Olive - Cook: 3 active, 478.8 MW of 3 filed
- Blossom Trail: 1 active, 150 MW of 2 filed
- DC Cook Unit 2: 2 active, 121 MW of 2 filed
- Watervliet: 2 active, 5.5 MW of 2 filed