Blossom Trail substation interconnection queue
1 active project totalling 150 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
150active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1596 | Blossom Trail 138kV 138 kV | 138 | 150 | Battery | Active |
| AH2-373 | Blossom Trail 138 kV | 138 | 132 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.