DC Cook Unit 2 substation interconnection queue
2 active projects totaling 121 MW in the PJM queue.
2 PJM queue filings name DC Cook Unit 2 as the point of interconnection, all in Berrien County, MI.
Target commercial operation dates as filed run from Nov 2016 to Jun 2020 (2 filings).
2active projects
121active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Z1-051 | D.C. Cook Generating Plant Unit No. 2 | n/r | 83 | Nuclear | In Service | Nov 2016 |
| AC2-140 | DC Cook Generating Plant Unit No. 2 | n/r | 38 | Nuclear | In Service | Jun 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Berrien County, MI
- Olive - Cook: 3 active, 478.8 MW of 3 filed
- Blossom Trail: 1 active, 150 MW of 2 filed
- Cook: 1 active, 84 MW of 2 filed
- Watervliet: 2 active, 5.5 MW of 2 filed