Cloverdale 345kV 345 kV
PJM queue ID C01-2044
Cloverdale 345kV 345 kV (C01-2044) is listed in the PJM interconnection queue as a 250 MW battery project in Botetourt County, VA. The filing names Cloverdale as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 10, 2030.
| Queue ID | C01-2044 |
|---|---|
| Project name | Cloverdale 345kV 345 kV |
| Status (as published) | Active |
| Substation | Cloverdale |
| Point of interconnection | Cloverdale 345kV 345 kV |
| County | Botetourt |
| State | VA |
| Voltage | 345 kV |
| Capacity | 250 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-04-10 |
| Source dataset | cycle |
Same substation and county
Cloverdale substation: 2 requests in the PJM queue, 1 active totaling 250 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-155 | Cloverdale 34.5 kV | 8 | Battery | Withdrawn |
Botetourt, VA: 13 requests in the PJM queue, 4 active totaling 342.1 MW.
A substation with the same name is named in PJM transmission planning materials: Cloverdale (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Gateway Grid, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 250.0 |
| MW capacity | 250.0 |
| MFO | 250.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.