Lexington-Low Moor substation interconnection queue

1 active project totalling 10.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
10.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-225 Lexington-Low Moor 230kV 230 32 Wind Withdrawn
AA1-038 Rocky Forge Wind 230 10.1 Wind Under Construction

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.