Lexington-Low Moor substation interconnection queue
1 active project totalling 10.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
10.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-225 | Lexington-Low Moor 230kV | 230 | 32 | Wind | Withdrawn |
| AA1-038 | Rocky Forge Wind | 230 | 10.1 | Wind | Under Construction |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.