Claytor 138 kV (AH1-269) is listed in the PJM interconnection queue as a 50 MW battery project in Pulaski County, VA. The filing names Claytor as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2028.

Queue IDAH1-269
Project nameClaytor 138 kV
Status (as published)Active
SubstationClaytor
Point of interconnectionClaytor 138 kV
CountyPulaski
StateVA
Voltage138 kV
Capacity50 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-01
Source datasetcycle

Same substation and county

Claytor substation: 2 requests in the PJM queue, 2 active totaling 56.1 MW.

Queue IDProjectMWResourceStatus
C01-1663Claytor 138 kV6.1HydroActive

Pulaski, VA: 27 requests in the PJM queue, 4 active totaling 152.1 MW.

A substation with the same name is named in PJM transmission planning materials: Claytor (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperClaytor Energy Storage, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy50.0
MW capacity50.0
MFO50.0
Submitted date9/9/2021
Last updated8/28/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first