Blossom Trail 138kV 138 kV
PJM queue ID C01-1596
Blossom Trail 138kV 138 kV (C01-1596) is listed in the PJM interconnection queue as a 150 MW battery project in Berrien County, MI. The filing names Blossom Trail as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2032.
| Queue ID | C01-1596 |
|---|---|
| Project name | Blossom Trail 138kV 138 kV |
| Status (as published) | Active |
| Substation | Blossom Trail |
| Point of interconnection | Blossom Trail 138kV 138 kV |
| County | Berrien |
| State | MI |
| Voltage | 138 kV |
| Capacity | 150 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2032-12-31 |
| Source dataset | cycle |
Same substation and county
Blossom Trail substation: 2 requests in the PJM queue, 1 active totaling 150 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-373 | Blossom Trail 138 kV | 132 | Hybrid | Withdrawn |
Berrien, MI: 20 requests in the PJM queue, 15 active totaling 1,301 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Scout Solar LandCo, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 150.0 |
| MW capacity | 150.0 |
| MFO | 150.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.