East Fayette substation interconnection queue

2 active projects totaling 163.3 MW in the PJM queue.

2 PJM queue filings name East Fayette as the point of interconnection, all in Fulton County, OH.

Target commercial operation dates as filed run from Dec 2023 to May 2028 (2 filings). 1 active filing targets a date after November 27, 2026.

2active projects
163.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-206 CG Fulton County 138 119.4 Solar Engineering and Procurement May 2028
AE2-282 Arche Energy Project 138 43.9 Solar In Service Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “East Fayette” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Fulton County, OH

All 13 PJM queue filings in Fulton County, OH.