Fulton, OH interconnection queue
4 active projects totalling 740.1 MW in the PJM queue, plus 9 with terminal status (shown greyed).
4active projects
740.1active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1903 | Allen Jct - Midway 345 kV | 345 | 550.2 | Gas | Active |
| AG1-408 | Not reported | n/r | 180 | Solar | Withdrawn |
| AG2-053 | Fulton 138 kV | 138 | 180 | Solar | Withdrawn |
| AF1-206 | CG Fulton County | 138 | 119.4 | Solar | Engineering and Procurement |
| AG2-054 | Fulton 138 kV | 138 | 100 | Battery | Withdrawn |
| AH2-289 | East Fayette 138 kV II | 138 | 79.6 | Battery | Withdrawn |
| AH2-155 | Lyons-Allen Jct 138 kV | 138 | 57 | Solar | Withdrawn |
| AH2-165 | Fayette - Lyons 138 kV | 138 | 48 | Solar | Withdrawn |
| AE2-282 | Arche Energy Project | 138 | 43.9 | Solar | In Service |
| AH2-166 | Lyons 138 kV | 138 | 27 | Solar | Withdrawn |
| AF1-120 | Arche Energy Project | 138 | 26.6 | Solar | In Service |
| W3-059C_AT8 | Allen Junction 138kV | 138 | 12.9 | Wind | Withdrawn |
| W3-059B_AT7 | Allen Junction-Lyons 138kV | 138 | 12.7 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.