Bay Shore substation interconnection queue

1 active project totalling 95.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
95.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z1-030 Bay Shore 138kV 138 464 Gas Withdrawn
C01-1948 Bay Shore 138 kV 138 95.8 Gas Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.