Colice Hall Solar

PJM queue ID AB2-099

Colice Hall Solar (AB2-099) is listed in the PJM interconnection queue as a 3.5 MW solar project in Hertford County, NC. The filing names Ahoskie as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 23, 2023.

Queue IDAB2-099
Project nameColice Hall Solar
Status (as published)In Service
SubstationAhoskie
Point of interconnectionAhoskie 34.5kV
CountyHertford
StateNC
Voltage34.5 kV
Capacity3.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-07-23
Source datasetserial

Same substation and county

Ahoskie substation: 8 requests in the PJM queue, 2 active totaling 11.9 MW.

Queue IDProjectMWResourceStatus
AE2-346Colice Hall Solar8.4SolarIn Service
AG1-082NC1 Ahoskie Central Solar Project12HybridWithdrawn
AG1-083Ahoskie 34.5 kV12HybridWithdrawn
AC1-163Ahoskie 34.5KV11.5SolarWithdrawn
AG1-035Ahoskie 34.5 kV6SolarWithdrawn
AG1-037NC3 Ahoskie South Solar Project3HybridWithdrawn
AH1-091Ahoskie 34.5kV0BatteryWithdrawn

Hertford, NC: 30 requests in the PJM queue, 5 active totaling 82.1 MW.

A substation with the same name is named in PJM transmission planning materials: Ahoskie Substation (DOM, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5
MW capacity3.5
MFO5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first