Wildcat Point

PJM queue ID Y1-065

Wildcat Point (Y1-065) is listed in the PJM interconnection queue as a 805 MW gas project in Cecil County, MD. The filing names Rock Springs as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 21, 2017.

Queue IDY1-065
Project nameWildcat Point
Status (as published)In Service
SubstationRock Springs
Point of interconnectionRock Springs 500kV
CountyCecil
StateMD
Voltage500 kV
Capacity805 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2017-09-21
Source datasetserial

Same substation and county

Rock Springs substation: 10 requests in the PJM queue, 8 active totaling 1,037.7 MW.

Queue IDProjectMWResourceStatus
Y3-102Wildcat Point135GasIn Service
AD2-167Wildcat Point52GasIn Service
R20Rock Springs Units 3 & 420GasIn Service
U4-015Rocks Springs 1 & 28.7GasIn Service
AC2-018Rock Springs Units #3 & #48GasIn Service
AE2-061Rock Springs Unit #1 and Unit #27GasIn Service
Z1-041Rock Springs Units #1 & #22GasIn Service
X4-024Rock Springs 500kV109Not reportedWithdrawn
AI2-054Rock Springs 500 kV0BatteryWithdrawn

Cecil, MD: 25 requests in the PJM queue, 10 active totaling 1,967.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy834.1
MW capacity805
MFO834.1

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first