Wildcat Point

PJM queue ID AD2-167

Wildcat Point (AD2-167) is listed in the PJM interconnection queue as a 52 MW gas project in Cecil County, MD. The filing names Rock Springs as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2019.

Queue IDAD2-167
Project nameWildcat Point
Status (as published)In Service
SubstationRock Springs
Point of interconnectionRock Springs 500kV
CountyCecil
StateMD
Voltage500 kV
Capacity52 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2019-12-31
Source datasetserial

Same substation and county

Rock Springs substation: 10 requests in the PJM queue, 8 active totaling 1,037.7 MW.

Queue IDProjectMWResourceStatus
Y1-065Wildcat Point805GasIn Service
Y3-102Wildcat Point135GasIn Service
R20Rock Springs Units 3 & 420GasIn Service
U4-015Rocks Springs 1 & 28.7GasIn Service
AC2-018Rock Springs Units #3 & #48GasIn Service
AE2-061Rock Springs Unit #1 and Unit #27GasIn Service
Z1-041Rock Springs Units #1 & #22GasIn Service
X4-024Rock Springs 500kV109Not reportedWithdrawn
AI2-054Rock Springs 500 kV0BatteryWithdrawn

Cecil, MD: 25 requests in the PJM queue, 10 active totaling 1,967.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy90
MW capacity52
MFO1090

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first