Beaver 138 kV

PJM queue ID C01-2183

Beaver 138 kV (C01-2183) is listed in the PJM interconnection queue as a 700 MW gas project in Lorain County, OH. The filing names Beaver as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2032.

Queue IDC01-2183
Project nameBeaver 138 kV
Status (as published)Active
SubstationBeaver
Point of interconnectionBeaver 138 kV
CountyLorain
StateOH
Voltage138 kV
Capacity700 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2032-05-01
Source datasetcycle

Same substation and county

Beaver substation: 7 requests in the PJM queue, 6 active totaling 1,310 MW.

Queue IDProjectMWResourceStatus
AG1-500West Lorain Power Plant 345 kV385.5GasEngineering and Procurement
C01-2182Beaver 138 kV173.5GasActive
AF2-004West Lorain Power Plant 345 kV33GasEngineering and Procurement
AG1-501West Lorain 138 kV Power Plant10GasEngineering and Procurement
AF2-005West Lorain 138 kV Power Plant8GasEngineering and Procurement
AC1-150Beaver 138kV76SolarWithdrawn

Lorain, OH: 11 requests in the PJM queue, 5 active totaling 1,136.5 MW.

A substation with the same name is named in PJM transmission planning materials: Beaver (ATSI, 12 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperVermillion Power, L.L.C.
Transmission ownerATSI
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy700.0
MW capacity700.0
MFO700.0
Submitted date4/27/2026
Last updated6/18/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.