Beaver 138 kV
PJM queue ID C01-2182
Beaver 138 kV (C01-2182) is listed in the PJM interconnection queue as a 173.5 MW gas project in lorain County, OH. The filing names Beaver as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2032.
| Queue ID | C01-2182 |
|---|---|
| Project name | Beaver 138 kV |
| Status (as published) | Active |
| Substation | Beaver |
| Point of interconnection | Beaver 138 kV |
| County | lorain |
| State | OH |
| Voltage | 138 kV |
| Capacity | 173.5 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2032-05-01 |
| Source dataset | cycle |
Same substation and county
Beaver substation: 7 requests in the PJM queue, 6 active totaling 1,310 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2183 | Beaver 138 kV | 700 | Gas | Active |
| AG1-500 | West Lorain Power Plant 345 kV | 385.5 | Gas | Engineering and Procurement |
| AF2-004 | West Lorain Power Plant 345 kV | 33 | Gas | Engineering and Procurement |
| AG1-501 | West Lorain 138 kV Power Plant | 10 | Gas | Engineering and Procurement |
| AF2-005 | West Lorain 138 kV Power Plant | 8 | Gas | Engineering and Procurement |
| AC1-150 | Beaver 138kV | 76 | Solar | Withdrawn |
lorain, OH: 1 request in the PJM queue, 1 active totaling 173.5 MW.
A substation with the same name is named in PJM transmission planning materials: Beaver (ATSI, 12 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Vermillion Power, L.L.C. |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 170.3 |
| MW capacity | 173.5 |
| MFO | 388.6 |
| Submitted date | 4/27/2026 |
| Last updated | 6/19/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.