Substation Scout

Lorain, OH interconnection queue

5 active projects totalling 1,136.5 MW in the PJM queue, plus 6 with terminal status (shown greyed).

5active projects
1,136.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-2183 Beaver 138 kV 138 700 Gas Active
AG1-500 West Lorain Power Plant 345 kV 345 385.5 Gas Engineering and Procurement
AI1-177 Avon 345 kV II 345 200 Battery Withdrawn
AF1-279 Carlisle 138 kV 138 90 Hybrid Withdrawn
AH2-345 Wellington 138 kV 138 80.6 Solar Withdrawn
AF2-004 West Lorain Power Plant 345 kV 345 33 Gas Engineering and Procurement
W4-004A_AT10 Lorain 69 19.2 Gas Deactivated
AG1-501 West Lorain 138 kV Power Plant 138 10 Gas Engineering and Procurement
AF2-005 West Lorain 138 kV Power Plant 138 8 Gas Engineering and Procurement
AI1-139 Henrietta Township - New Russia Township 69 kV 69 6 Solar Withdrawn
AF1-199 Avon Lake Plant 138 4 Other Deactivated

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.