lorain, OH interconnection queue

1 active project totalling 173.5 MW in the PJM queue.

1active projects
173.5active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-2182 Beaver 138 kV 138 173.5 Gas Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.