Substation Scout

Jetersville-Ponton 115 kV

PJM queue ID C01-2000

Jetersville-Ponton 115 kV (C01-2000) is listed in the PJM interconnection queue as a 100 MW battery project in Amelia County, VA. The filing names Jetersville-Ponton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 28, 2031.

Queue IDC01-2000
Project nameJetersville-Ponton 115 kV
Status (as published)Active
SubstationJetersville-Ponton
Point of interconnectionJetersville-Ponton 115 kV
CountyAmelia
StateVA
Voltage115 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-12-28
Source datasetcycle

Same substation and county

Jetersville-Ponton substation: 7 requests in the PJM queue, 5 active totaling 158.5 MW.

Queue IDProjectMWResourceStatus
AF1-294Amelia Energy Facility22.2SolarEP
AF2-115Amelia Energy Facility13.5SolarEP
AH1-280Jetersville-Ponton 115 kV12SolarActive
AG1-021Amelia Energy Facility10.8SolarEP
AG1-048Jetersville-Ponton 115 kV52.5SolarWithdrawn
C01-1347Jetersville-Ponton 115 kV12SolarWithdrawn

Amelia, VA: 8 requests in the PJM queue, 6 active totaling 160.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperAmelia Energy Facility, LLC
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy100.0
MW capacity100.0
MFO206.0
Submitted date4/27/2026
Last updated6/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.