Jetersville-Ponton substation interconnection queue
5 active projects totaling 158.5 MW in the PJM queue, plus 2 with terminal status (shown grayed).
7 PJM queue filings name Jetersville-Ponton as the point of interconnection, all in Amelia County, VA.
Target commercial operation dates as filed run from Dec 2022 to Dec 2031 (7 filings). 5 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (6 filings).
5active projects
158.5active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2000 | Jetersville-Ponton 115 kV | 115 | 100 | Battery | Active | Dec 2031 |
| AG1-048 | Jetersville-Ponton 115 kV | 115 | 52.5 | Solar | Withdrawn | Dec 2022 |
| AF1-294 | Amelia Energy Facility | 115 | 22.2 | Solar | EP | Mar 2031 |
| AF2-115 | Amelia Energy Facility | 115 | 13.5 | Solar | EP | Nov 2028 |
| AH1-280 | Jetersville-Ponton 115 kV | 115 | 12 | Solar | Active | Dec 2028 |
| C01-1347 | Jetersville-Ponton 115 kV | 115 | 12 | Solar | Withdrawn | Dec 2028 |
| AG1-021 | Amelia Energy Facility | 115 | 10.8 | Solar | EP | Nov 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Amelia County, VA
No other substation in Amelia County, VA is named as a point of interconnection in the PJM queue.